Institutional-Repository, University of Moratuwa.  

Efficiency improvements to the hydro power plants in the Laxapana complex

Show simple item record

dc.contributor.advisor Wijayapala, WDAS
dc.contributor.author Jayawardene, CDRJ
dc.date.accessioned 2015-07-06T09:52:51Z
dc.date.available 2015-07-06T09:52:51Z
dc.date.issued 2015-07-06
dc.identifier.citation Jayawardene, C.D.R.J. (2014). Efficiency improvements to the hydro power plants in the Laxapana complex [Master's theses, University of Moratuwa]. Institutional Repository University of Moratuwa. http://dl.lib.mrt.ac.lk/handle/123/10987
dc.identifier.uri http://dl.lib.mrt.ac.lk/handle/123/10987
dc.description.abstract The main objective of this research is to present effective efficiency improvements to the hydropower plants in the Laxapana Complex. At present, electricity consumption in Sri Lanka is being increased at a rate of about seven present. Hence, improving the efficiency in an existing hydropower complex will lead to an increase in the electricity generation capacity of the National Grid using the same waters of the existing schemes. In this research, observed key areas are techno-economically analyzed with the view of efficiency improvement. All the areas introduced are important when they are viewed as total energy improvement projects. However, In order to implement a project, it should be viable. Hence, in this report, certain areas are discussed, and only viable modifications are presented as efficiency improvement projects. In this study, efficiency improvement to the Old Laxapana power station through a new generator design, capacity improvement to the Laxapana pond in order to minimize annual water spilling, new generator installation to the Samanala Power Station and leakage analysis of the New Laxapana tunnel have been proposed. For the analysis, past data and the findings of certain researches have been used. The study of the Old Laxapana Power Station was carried out focusing on the Old Laxapana Stage-II generators. From the cost-benefit analysis, a simple payback period of four years was observed. Next, from the cost-benefit analysis of the capacity improvement of the Laxapana pond, a payback period of 14.3 years found, and it was accepted considering the lifetime of the dam proposed. After that, a seven-year simple payback period was observed by proposing a 13.6 MW-generator for the Samanala Power Station as capacity improvement. Finally, the tunnel leakage analysis for the New Laxapana power station was carried out, obtaining 6.5-year simple payback period, and, hence, it was recommended to implement the repair during the rehabilitation. en_US
dc.language.iso en en_US
dc.subject ELECTRICAL ENGINEERING - Dissertation en_US
dc.subject ELECTRIC POWER TRANSMISSION
dc.subject HYDRO POWER PLANTS
dc.subject HYDRO ELECTRIC POWER PLANTS
dc.title Efficiency improvements to the hydro power plants in the Laxapana complex en_US
dc.type Thesis-Abstract en_US
dc.identifier.faculty Engineering en_US
dc.identifier.degree MSc. en_US
dc.identifier.department Department of Electrical Engineering en_US
dc.date.accept 2014
dc.identifier.accno 107113 en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record