Institutional-Repository, University of Moratuwa.  

Integrating design freeze in to large-scale construction projects in Sri Lanka

Show simple item record

dc.contributor.author Hemal, RMN
dc.contributor.author Waidyasekara, KGAS
dc.contributor.author Ekanayake, EMAC
dc.date.accessioned 2018-07-20T19:41:59Z
dc.date.available 2018-07-20T19:41:59Z
dc.date.issued 2017
dc.identifier.uri http://dl.lib.mrt.ac.lk/handle/123/13267
dc.description.abstract Change is inevitable in most construction projects due to uniqueness of projects and limited resources. Previous studies revealed that design changes are accountable for 78% of the total cost deviation in construction projects. Design Freeze (DF) is one method used during design development stage to mitigate the risks associated with change. This organizes and complies the design process, control changes, and force the completion of design stages on time. However, this is a novel concept to the construction industry. Hence, this study focused on investigating the DF concept in terms of its adoptability in largescale construction projects to enhance project performance by minimizing changes. The present study adopted a mixed approach where the questionnaire survey and expert interviews helped to derive findings. Questionnaire survey was administered to hundred (100) industry professionals with a response rate of 87%. Further, an expert opinion survey was performed with nine subject matter experts. The quantitative data were analysed using SPSS software, whereas code based content analysis using Nvivo version 11 supported to analyse qualitative data. The findings revealed that the client and the consultant are the major parties causing design changes. Selecting an experienced and qualified design team, permitting adequate time frame for design development, and etc. are the significant factors to be considered when implementing a DF. Furthermore, the study identified the impracticability of adopting a 100% design freeze in large-scale construction projects, and the interviewees accepted the concept of partial design freeze by identifying strategies targeted to maximize the design percentage. en_US
dc.language.iso en en_US
dc.subject Design Change; Design Freeze; Construction Industry en_US
dc.title Integrating design freeze in to large-scale construction projects in Sri Lanka en_US
dc.type Conference-Abstract en_US
dc.identifier.faculty Architecture en_US
dc.identifier.department Department of Building Economics en_US
dc.identifier.year 2017 en_US
dc.identifier.conference Moratuwa Engineering Research Conference - MERCon 2017 en_US
dc.identifier.place Moratuwa, Sri Lanka en_US
dc.identifier.email niroshanhemal@gmail.com, anuradha@uom.lk, anushikac@yahoo.com en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record