dc.description.abstract The Electricity system load profile of Sri Lanka has a high evening peak demand and as a result has a low load factor. The load curve has a close relationship with the human behavior and other economic activities of the country, having a morning peak, Day peak and a night peak. Even though it is desirable to have a flat load curve, due to this behavioral impact, the curve is having rather large variations. The extent of variation is so substantial that the maximum demand is having a greater value, which is about 2.24 times of the minimum demand. During the dry season water level of the large hydro reservoirs is getting decrease rapidly and system demand fulfill by thermal generation of CEB and Private Power Plants. Therefore most of the high cost small thermal generators should be operated in the evening peak hours. Hence, CEB has to pay additional cost for power generation than income earns from electricity selling to the customer. That reason is happened to fulfill the peak demand using high cost thermal generation. The objective ofthis feasibility study is prepared the system ofscheduled running for existing mini hydro power plants to reduce high cost thermal generation at evening peak hours. The study has contained the energy mix of Sri Lanka, behavior of thermal generation in future, present mini hydro running pattern, possibility of schedule running of existing mini hydro plants and prepare the generalized system to operate mini hydro plant for schedule running. According to the results, some of mini hydro plants in the existing system can operate under the scheduled running and the results of scheduled mini hydro plants have affect to reduce high cost thermal generation by small thermal generators. en_US
dc.language.iso en en_US
dc.subject ELECTRICAL ENGINEERING
dc.subject ELECTRICITY SYSTEM LOAD PROFILE-Sri Lanka
dc.subject MINI HYDRO PWER PLANTS-Sri Lanka
dc.subject Thermal generation
dc.title Feasibility of scheduled running of existing mini hydro power plants en_US
dc.type Thesis-Full-text en_US
dc.identifier.faculty Engineering en_US
dc.identifier.degree MSc in Electrical Engineering en_US
dc.identifier.department Department of Electrical Engineering en_US
dc.date.accept 2017-03
dc.identifier.accno TH3345 en_US