Institutional-Repository, University of Moratuwa.  

Possibilities of reducing train delays between Colombo Fort and Maradana

Show simple item record

dc.contributor.advisor Bandara, JMSJ
dc.contributor.author Jayasekara, VCD
dc.date.accessioned 2019-04-06T06:35:09Z
dc.date.available 2019-04-06T06:35:09Z
dc.identifier.uri http://dl.lib.mrt.ac.lk/handle/123/14172
dc.description.abstract Sri Lanka Railways (SLR) is operating around 300 passenger train movements daily across its 1400 Km rail network. About 90% of train movements out of this have Maradana or Colombo as the destination or the starting point. It further leads to a figure that around 50 trains which amount to more than 30% of the inbound train service to Colombo is reaching either Colombo Fort or Maradana daily within the morning peak time. All these train movements are using the Colombo - Maradana block section which comprises of only four rail tracks, hence causing a reasonable delay for the morning peak hour train service. Delay in this particular section is commonly identified as caused by the lack ofinfrastructure which includes less number of Platforms, inappropriately arranged sendee feeders (depots) and low flexibility in the signaling system. In addition to this the overlap operation between Colombo and Maradana, which is resulted by always keeping the furthermost station as the destination or starting point. Overlap operation has created additional train movements which leads the situation to an even worse. Objective of this research is to find out the root cause for the delay in the Colombo Fort - Maradana section and explore the possibilities of reducing train delays. In this view, the delay portion pertaining to this section is quantified through a survey and it confirms the worthiness of the research. It was then continued to check the actual requirement of continuing the overlap operation and in results, sufficient evidence found for a service restriction. Actual line and platform utilization at present were calculated to find out whether any alterations are required to the systems and operational practices. Train feeding arrangements are also studied for suggesting modifications for the practices in order to catch up the delays. Mainly the issues in reducing the number of train movements in the section and reshuffling the feeding arrangements to achieve this target are addressed in this research. en_US
dc.language.iso en en_US
dc.subject Trains en_US
dc.subject Delayes en_US
dc.subject Platforms en_US
dc.subject Railway en_US
dc.title Possibilities of reducing train delays between Colombo Fort and Maradana en_US
dc.type Thesis-Full-text en_US
dc.identifier.faculty Engineering en_US
dc.identifier.degree MSc. in Transportation en_US
dc.identifier.department Department of Civil Engineering en_US
dc.date.accept 2017-05
dc.identifier.accno TH3586 en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record