Abstract:
The recent crisis in the energy sector has raised the need of exploration of additional renewable
energy sources. Run-of-the-River (RoR) hydropower systems that harvest the energy from
flowing water to generate electricity in the absence of a large dam and reservoir required in
conventional impoundment hydroelectric facilities are gaining interest due to their minimum
impact to the environment. Identifying suitable locations with significant potential of RoR
hydropower capacity by using conventional methods is hindered in remote hilly inaccessible
areas. The GIS tools and ABCD hydrologic model are used in the present study to remotely define
and identify the feasible geographical features and estimate streamflow generation which governs
the available hydropower capacity of potential sites in the project area.
The Upper Kelani Basin was selected as the overall project study area and two uppermost subcatchments,
namely Norwood and Holombuwa, were selected to optimize the ABCD model
parameters for simulating streamflows with the selected rain gauge stations in each watershed.
The ABCD daily hydrological model was calibrated using 5 years of data from 2008~2013 and
validated based on four years of data from 2013~2017. The Shuttle Radar Topography Mission
(SRTM) 90 m and 30 m Digital Elevation Model (DEM) terrain data was used in catchment
delineation and available hydraulic head calculation along the river channel. The ABCD model
parameters identified based on the two sub-catchments were progressively transferred to the
downstream sub-catchments at locations where the feasible heads were available to establish
potential RoR hydropower stations.
The identified a, b, c and d hydrologic parameters for Norwood and Holombuwa sub-catchments
were (0.963, 398, 0.465 and 0.00001) and (0.995, 300, 0.542 and 0.0001), respectively. The
Pearson’s correlation coefficient (r) and coefficient of determination (R2) were used as objective
functions and the study found the values of ((0.825, 0.68), (0.59,0.35)) and ((0.87,0.75),
(0.61,0.37)) for both calibration and validation model runs, respectively. The algorithm developed
with Visual Basic for Application (VBA) Programming using extracted head from GIS tools in
ArcGIS (v 10.3) platform to detect feasible sites based on river gradient coupled with flow
estimates from the ABCD hydrologic model was found to be capable of remotely identifying
potential locations for RoR hydropower generation. The study successfully established 36 suitable
locations for RoR hydropower in the selected sub-basins.
The study shows that the proposed approach has vast advantages over the slow, cumbersome,
uneconomical, conventional survey-based methods used for identification of potential RoR sites
and further studies are recommended to recognize the sensitivity to terrain variations and
incorporate alternatives for overall system optimization.
Citation:
Pandit, B. (2019). Identification of suitable locations for run-of-the river hydropower generation using GIS and ABCD model in upper Kelani river basin in Sri Lanka [Master’s theses, University of Moratuwa]. Institutional Repository University of Moratuwa. http://dl.lib.uom.lk/handle/123/16378