dc.contributor.author |
Omotayo, T |
|
dc.contributor.author |
Kulatunga, U |
|
dc.contributor.editor |
Sandanayake, YG |
|
dc.contributor.editor |
Karunasena, GI |
|
dc.contributor.editor |
Ramachandra, T |
|
dc.date.accessioned |
2022-03-10T06:26:48Z |
|
dc.date.available |
2022-03-10T06:26:48Z |
|
dc.date.issued |
2016-07 |
|
dc.identifier.citation |
Omotayo, T., & Kulatunga, U. (2016). Re-thinking post-contract cost controlling techniques in the Nigerian construction industry. In Y.G. Sandanayake, G.I. Karunasena & T. Ramachandra (Eds.), Greening environment, eco-innovations & entrepreneurship (pp. 380-388). Ceylon Institute of Builders. https://ciobwcs.com/downloads/WCS2016-Proceedings.pdf |
en_US |
dc.identifier.uri |
http://dl.lib.uom.lk/handle/123/17252 |
|
dc.description.abstract |
The challenges of cost and time overruns, construction disputes and client dissatisfaction have plagued
the construction industry in Nigeria. This may be as a result of the approaches used in monitoring
construction costs. The execution phase of a construction project relies on post-contract cost
controlling techniques, such as cash flow monitoring, interim valuations, final account preparation,
monitoring activities, site meetings and documentation of activities on site. These techniques are
imperative for project success. The purpose of this paper is to assess the various techniques used in
post-contract cost control in Nigeria, in terms of their effectiveness. The data was gathered from one
hundred and thirty five (135) cost and project managers in Nigeria. The Kendall’s coefficient of
concordance was used to test the post-contract cost controlling techniques identified, through an
extensive literature review along with one sample run test.
The findings reveal that monitoring material cost was the most effective and important technique with
a Kendall’s W score of 1.33 and 11.44 respectively. Cash flow monitoring had the lowest score of 7.85
for effectiveness, while variation management had the lowest score of 6.88 for importance. The
effectiveness of the techniques was further evaluated using one sample run test. The findings show that
sixteen out of the eighteen techniques were not effective from an overall point of view. The cost
controlling techniques used in the Nigerian construction industry are deficient and generally
ineffective. Therefore, there is a need to research alternative post-contract cost controlling techniques
for the construction industry in Nigeria. |
en_US |
dc.description.sponsorship |
International Council for Research and Innovation in Building and Construction (CIB) |
en_US |
dc.language.iso |
en |
en_US |
dc.publisher |
Ceylon Institute of Builders |
en_US |
dc.relation.uri |
https://ciobwcs.com/downloads/WCS2016-Proceedings.pdf |
en_US |
dc.subject |
Construction industry |
en_US |
dc.subject |
Cost |
en_US |
dc.subject |
Cost controlling techniques |
en_US |
dc.subject |
Nigeria |
en_US |
dc.subject |
Post-contract |
en_US |
dc.title |
Re-thinking post-contract cost controlling techniques in the Nigerian construction industry |
en_US |
dc.type |
Conference-Full-text |
en_US |
dc.identifier.faculty |
Architecture |
en_US |
dc.identifier.department |
Department of Building Economics |
en_US |
dc.identifier.year |
2016 |
en_US |
dc.identifier.conference |
5th World Construction Symposium 2016 |
en_US |
dc.identifier.place |
Colombo |
en_US |
dc.identifier.pgnos |
pp. 380-388 |
en_US |
dc.identifier.proceeding |
Greening environment, eco-innovations & entrepreneurship |
en_US |
dc.identifier.email |
T.omotayo@edu.salford.ac.uk |
en_US |
dc.identifier.email |
ukulatunga@uom.lk |
en_US |