dc.contributor.author |
Chanudha, RAC |
|
dc.contributor.author |
Disaratna, PAPVDS |
|
dc.contributor.author |
Anuruddika, SMN |
|
dc.contributor.author |
Ariyachandra, MRMF |
|
dc.contributor.editor |
Sandanayake, YG |
|
dc.contributor.editor |
Ramachandra, T |
|
dc.contributor.editor |
Gunatilake, S |
|
dc.date.accessioned |
2022-03-12T09:19:53Z |
|
dc.date.available |
2022-03-12T09:19:53Z |
|
dc.date.issued |
2017-06 |
|
dc.identifier.citation |
Chanudha, R.A.C., Disaratna, P.A.P.V.D.S., Anuruddika, S.M.N., & Ariyachandra, M.R.M.F. (2017). Procurement system selection model for the Sri Lankan construction industry. In Y.G. Sandanayake, T. Ramachandra & S. Gunatilake (Eds.), What’s new and what’s next in the built environment sustainability agenda? (pp. 337-349). Ceylon Institute of Builders. https://ciobwcs.com/downloads/WCS2017-Proceedings.pdf |
en_US |
dc.identifier.uri |
http://dl.lib.uom.lk/handle/123/17303 |
|
dc.description.abstract |
Construction procurement system involves processes of acquiring services and products for the project
activities starting from investigation up to the completion. With the development of new concepts and
technologies, construction procurement arrangements have also advanced. Erroneous selection of a
procurement system usually leads project to failure. Although, several procurement selection tools have
been developed to minimize the adverse effect of overwhelmed wrong selections, those tools are not widely
used in Sri Lanka (SL). Hence, it is vital to propose a new Procurement System Selection Model (PSSM)
which can overcome barriers of existing PSSM.
A qualitative approach was used to identify prevailing practices and barriers to practice existing selection
methods. Decision charts were developed by assigning average utility values for functional grouping,
payment method and pricing mechanism.
Accordingly, the preliminary procurement system selection framework was arranged which includes seven
steps namely; appoint an independent advisor, identification of project brief, identification and prioritizing
factors affecting selection of procurement selection, choose functional grouping and payment modality,
presentation of options found in step four in ascending order, selection of procurement strategy by the client
and selection of parties involved in the project. Ultimately, proposed PSSM in this study merge the existing
selection procedure in SL in a manner that leads selection into its best position. The study further
recommends timely modernization of decision charts with Average Utility Value (AUV) and procurement
systems, since suitability of each procurement system to selection criteria may change with development of
construction industry. |
en_US |
dc.language.iso |
en |
en_US |
dc.publisher |
Ceylon Institute of Builders |
en_US |
dc.relation.uri |
https://ciobwcs.com/downloads/WCS2017-Proceedings.pdf |
en_US |
dc.subject |
Procurement system |
en_US |
dc.subject |
Selection criterial |
en_US |
dc.subject |
Sri Lanka (SL) |
en_US |
dc.title |
Procurement system selection model for the Sri Lankan construction industry |
en_US |
dc.type |
Conference-Full-text |
en_US |
dc.identifier.faculty |
Architecture |
en_US |
dc.identifier.department |
Department of Building Economics |
en_US |
dc.identifier.year |
2017 |
en_US |
dc.identifier.conference |
6th World Construction Symposium 2017 |
en_US |
dc.identifier.place |
Colombo |
en_US |
dc.identifier.pgnos |
pp. 337-349 |
en_US |
dc.identifier.proceeding |
What’s new and what’s next in the built environment sustainability agenda? |
en_US |
dc.identifier.email |
sikymr@gmail.com |
en_US |
dc.identifier.email |
vijithad@uom.lk |
en_US |