Institutional-Repository, University of Moratuwa.  

Optimizing the specific charge for limestone blasting at Aruwakkalu limestone quarry

Show simple item record

dc.contributor.author Mendis, HCVS
dc.contributor.author Wimalagunasekara, KR
dc.contributor.author Jinadasa, MLS
dc.contributor.author Hemalal, PVA
dc.contributor.author Dharmaratne, PGR
dc.contributor.author Chaminda, SP
dc.contributor.editor Abeysinghe, AMKB
dc.contributor.editor Samaradivakara, GVI
dc.date.accessioned 2022-03-21T07:44:54Z
dc.date.available 2022-03-21T07:44:54Z
dc.date.issued 2018-08
dc.identifier.citation Mendis, H.C.V.S., Wimalagunasekara, K.R., Jinadasa, M.L.S., Hemalal, P.V.A., Dharmaratne, P.G.R., & Chaminda, S.P. (2018). Optimizing the specific charge for limestone blasting at Aruwakkalu limestone quarry. In A.M.K.B. Abeysinghe & G.V.I. Samaradivakara (Eds.), Proceedings of International Symposium on Earth Resources Management & Environment 2018 (pp. 21-27). Department of Earth Resources Engineering, University of Moratuwa. en_US
dc.identifier.uri http://dl.lib.uom.lk/handle/123/17423
dc.description.abstract The largest open pit limestone mine in Sri Lanka operated by Siam City Cement Lanka Limited is located at Aruwakkalu, Puttalam. The red soil overburden is directly excavated and low grade and high grade limestone layers are drilled and blasted. Specific charge plays a vital role in open pit blast design as it affects many operational costs in mining activities. An optimum specific charge with proper fragmentation not only reduces costs but also reduces undesirable effects like ground vibration, fly rock and air blast over pressure [1]. When optimizing the specific charge, it was decided to change the charging method by creating air decks and evaluate the fragmentation of the blasted material, because it was often difficult to accomplish several elements of improvement simultaneously. Fragment size directly affects the downstream operations like loading, transporting and crushing [2]. Two computer softwares, 'JKSimBlast' and 'Split-Desktop' were used to analyse fragmentation of material where the 'JKSimBlast' was used to simulate and analyze the modelled blasts while the 'Split-Desktop' was used to analyze the blasted material. The analysis of data by the software and cost analysis reveal that top column air deck charging method would save the cost of blasting by about 11% and the Specific Charge value is reduced by 19%, resulting in reasonable fragmentation and size distribution. en_US
dc.language.iso en en_US
dc.publisher Department of Earth Resources Engineering en_US
dc.subject Air deck charging method en_US
dc.subject Fragmentation en_US
dc.subject JKSimBlast en_US
dc.subject Split-desktop en_US
dc.title Optimizing the specific charge for limestone blasting at Aruwakkalu limestone quarry en_US
dc.type Conference-Full-text en_US
dc.identifier.faculty Engineering en_US
dc.identifier.department Department of Earth Resources Engineering en_US
dc.identifier.year 2018 en_US
dc.identifier.conference International Symposium on Earth Resources Management & Environment 2018 en_US
dc.identifier.place Thalawathugoda en_US
dc.identifier.pgnos pp. 21-27 en_US
dc.identifier.proceeding Proceedings of International Symposium on Earth Resources Management & Environment 2018 en_US
dc.identifier.email hpanagaoda54@gmail.com en_US
dc.identifier.email hemalal@uom.lk en_US
dc.identifier.email chaminda@uom.lk en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record