Institutional-Repository, University of Moratuwa.  

Plant and equipment management to minimize delays in road construction projects

Show simple item record

dc.contributor.author Randunupura, SN
dc.contributor.author Hadiwattege, C
dc.contributor.editor Sandanayake, YG
dc.contributor.editor Fernando, NG
dc.date.accessioned 2022-04-27T06:36:20Z
dc.date.available 2022-04-27T06:36:20Z
dc.date.issued 2013-06
dc.identifier.citation Randunupura, S.N., & Hadiwattege , C . (2013). Plant and equipment management to minimize delays in road construction projects . In Y.G. Sandanayake & N.G. Fernando (Eds.), Socio-economic sustainability in construction: practice, policy and research (pp. 333-342). Ceylon Instituteof Builders. htps://ciobwcs.com/downloads/WCS2013-Proceedings.pdf en_US
dc.identifier.uri http://dl.lib.uom.lk/handle/123/17733
dc.description.abstract Construction is the ultimate objective of a design, and the transformation of a design by construction into a useful structure which is accomplished through proper management of human, material, machineries and equipment resources. A project manager must insure that these inputs are effectively coordinated to achieve an efficient construction process. “Delay” in construction is a project slipping over the planned schedule and is considered as a common problem in construction projects. Plant and Equipment (P&E) management is a complex procedure in a construction project. Machines are to be selected, arrived on site, are used and, when a project is completed, removed and returned to the company's plant depot or the hire company. Within this cycle various decisions and assessments are required to be made. These are related to above challenges and delays due such could be affected directly or indirectly by poor P&E management. Hence, introduction of proper construction P&E management criteria helps in minimizing the confusion created due to the above problems and further to cut down monetary losses. Therefore, this research aims to study the effects of improper P&E management on construction delays and to identify proper practices on P&E management to minimize delays. The paper discusses the theoretical background of the issue based on the findings of the comprehensive literature review done through refereeing to the published material. Research will be followed by a questionnaire survey to explore the situation within the Sri Lankan road construction projects as the field study. The data will be analyzed statistically in order to make conclusions and recommendations. en_US
dc.language.iso en en_US
dc.publisher Ceylon Institute of Builders en_US
dc.relation.uri https://ciobwcs.com/downloads/WCS2013-Proceedings.pdf en_US
dc.subject Construction projects en_US
dc.subject Delays en_US
dc.subject Management en_US
dc.subject Plant and equipment en_US
dc.title Plant and equipment management to minimize delays in road construction projects en_US
dc.type Conference-Full-text en_US
dc.identifier.faculty Architecture en_US
dc.identifier.department Department of Building Economics en_US
dc.identifier.year 2013 en_US
dc.identifier.conference 2nd World Construction Symposium en_US
dc.identifier.place Colombo en_US
dc.identifier.pgnos pp. 333-342 en_US
dc.identifier.proceeding Socio-economic sustainability in construction: practice, policy and research en_US
dc.identifier.email srinuwanr@gmail.com en_US
dc.identifier.email chandanieh@uom.lk en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record