Institutional-Repository, University of Moratuwa.  

Stope productivity improvement through application of cut-and-fill mining method variant at Bogala graphite mines, Sri Lanka

Show simple item record

dc.contributor.author Abeykoon, AGTBB
dc.contributor.author Lanka, KASS
dc.contributor.author Ovitigala, IR
dc.contributor.author Wijerathna, KS
dc.contributor.author Hemalal, PVA
dc.contributor.author Dharmaratne, PGR
dc.contributor.editor Hemalal, PVA
dc.date.accessioned 2022-07-28T04:50:56Z
dc.date.available 2022-07-28T04:50:56Z
dc.date.issued 2016-07
dc.identifier.citation Abeykoon, A.G.T.B.B., Lanka, K.A.S.S., Ovitigala, I.R., Wijerathna, K.S., Hemalal, P.V.A., & Dharmaratne, P.G.R. (2016). Stope productivity improvement through application of cut-and-fill mining method variant at Bogala graphite mines, Sri Lanka. In P.V.A. Hemalal (Ed.), Proceedings of the ERE 2016 Annual Conference on Earth Resources Management (pp. 23-28). Department of Earth Resources Engineering, University of Moratuwa. en_US
dc.identifier.uri http://dl.lib.uom.lk/handle/123/18489
dc.description.abstract Vein graphite mining is more often carried out by underground mining in Sri Lanka due to its mode of occurrence. Bogala underground mine is one of the major graphite mines in the country, where overhand cut-and-fill mining method is used for the extraction of graphite since the ore bodies are steeply dipping, with considerable vertical extent and clear and stable ore boundaries. According to the standard practices at the mine, ectraction is carried out at the stope by blasting of both rock and graphite vein in the exposed face, followed by hand sorting to collect graphite. Blasting the host rock and veins are carried out separately. Waste rock generated is used to fill the lower bench. Simultaneously, stope support is carried out and the working platform prepared. In this practice one cycle extends for four shifts and the research was launched with the objective of improving stope productivity by reducing the cycle time. In the proposed methodology, blasting of the face (graphite vein and rock) was carried out simultaneously resulting in the reduction of cycle time to two shifts. Therefore, in the research carried out, with the proposed alternative stope technique followed by froth flotation relevant performance indicators or parameters of productivity, cost and safety were analysed. en_US
dc.language.iso en en_US
dc.publisher Department of Earth Resources Engineering en_US
dc.subject Blasting en_US
dc.subject Cost en_US
dc.subject Cycle time en_US
dc.subject Froth flotation en_US
dc.title Stope productivity improvement through application of cut-and-fill mining method variant at Bogala graphite mines, Sri Lanka en_US
dc.type Conference-Full-text en_US
dc.identifier.faculty Engineering en_US
dc.identifier.department Department of Earth Resources Engineering en_US
dc.identifier.year 2016 en_US
dc.identifier.conference ERE 2016 Annual Conference on Earth Resources Management en_US
dc.identifier.place Katubedda en_US
dc.identifier.pgnos pp. 23-28 en_US
dc.identifier.proceeding Proceedings of the ERE 2016 Annual Conference on Earth Resources Management en_US
dc.identifier.email hpanagoda54@gmail.com en_US
dc.identifier.email dharme27@yahoo.com en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record