dc.description.abstract Within the sphere of construction, the “estimating process'1 is a significant element due to the lack of financial resources available, and out of the branches of estimating, pre-tender cost estimating of road construction projects requires extensive knowledge and expertise. The aim of this research is to assist clients and consultants in improving the predictive ability of the cost estimating of road construction in Sri Lanka. This research hits been conducted through a literature renew of topics related to the cost estimating process, followed by a questionnaire survey. The analyzing of 59 factors conclude that the main factors affecting the accuracy of pre-tender cost estimation of road construction are: accuracy and reliability of cost information, material (prices l availability I supply I quality /imports), clear and detailed drawings and specifications, completeness of cost information, designer’s experience level. “Spearman s Rank Correlation Coefficient ” test was used as a measure of agreement between the three groups of respondents with regard to factors ranking, and it appears that they are generally in strong agreement. Finally, 15 expert interviews were conducted to identify the existing practices of cost estimation of road construction in Sri Lanka. These conclude that the main existing practices are: comparison with past similar projects based on personal experience, established standards ex. HSR (Highway Schedule Rates) and comparison with similar past projects based on documented facts The study recommended that both clients and consultants give more attention to the cost estimating process and to hire qualified technical staff in order to obtain the accurate estimate and to keep computerized historical data of completed projects. en_US
dc.language.iso en en_US
dc.publisher Faculty of Architecture University of Moratuwa en_US
dc.subject pre- tender cost estimation en_US
dc.subject accuracy
dc.subject clients
dc.subject consultants
dc.title Factors Affecting the Accuracy of Pre-Tender Estimation of Road Construction in Sri Lanka en_US
dc.type Article-Full-text en_US
dc.identifier.year 2013 en_US
dc.identifier.journal Research Journal of the Faculty of Architecture en_US