Institutional-Repository, University of Moratuwa.  

An evaluation of the outcomes of the urban development plans with special reference to moratuwa urban development plan

Show simple item record

dc.contributor.author Ranasinghe, TKGP
dc.contributor.author De Silva, ML
dc.contributor.editor Sandanayake, YG
dc.contributor.editor Fernando, NG
dc.date.accessioned 2022-09-08T03:17:46Z
dc.date.available 2022-09-08T03:17:46Z
dc.date.issued 2013-06
dc.identifier.citation Ranasinghe , T. K. G. P., & De Silva, M. L. (2013 ). An evaluation of the outcomes of the urban development plans with special reference to moratuwa urban development plan .In Y.G. Sandanayake & N.G. Fernando (Eds.), Socio-economic sustainability in construction: practice, policy and research (pp. 22-32). Ceylon Instituteof Builders. htps://ciobwcs.com/downloads/WCS2013-Proceedings.pdf en_US
dc.identifier.uri http://dl.lib.uom.lk/handle/123/18961
dc.description.abstract Plan outcome evaluation (POE) is very significant rather than focusing on planning process, usefulness of plan, content and quality of plan. POE has been ignored in the field of planning due to lack of proper POE method.This study focuses on the ex post facto evaluation considering the outcomes of action projects of development plans and aim to develop a POE method to evaluate outcomes of development plan towards the achievement of its objectives quantitatively since no one has made such an attempt. Achieving outcomes of development plan directly affect for sustainable urbanisation. A comprehensive literature survey revealed that adaptation of the components of objective driven, theory-driven and theory-based, utilization-driven and theoretical data-driven evaluation methods will lead to overcome related issues on plan outcome evaluation and identified basic four steps suitable to incorporate in any POE method.This developed POE method comprises four steps including mathematical models. Field surveys and questionnaire surveys were carried out to identify public perception on achievement of outcomes of action projects. Developed POE method can be used as a progress monitoring tool and as an outcome evaluation tool. This POE method will be a useful tool for planners, project managers and policy makers to improve planning practices and provide necessary knowledge for revising plansin order to ensure the sustainable urbanisation. This study can be extended to evaluate the outcomes of development plan when objectives are clear and measurable further considering theory, process and objectives driven methods. en_US
dc.language.iso en en_US
dc.publisher Ceylon Institute of Builders en_US
dc.relation.uri https://ciobwcs.com/downloads/WCS2013-Proceedings.pdf en_US
dc.subject Outcomes of development plan en_US
dc.subject POE method en_US
dc.subject Public perception en_US
dc.title An evaluation of the outcomes of the urban development plans with special reference to moratuwa urban development plan en_US
dc.type Conference-Full-text en_US
dc.identifier.faculty Architecture en_US
dc.identifier.department Department of Building Economics en_US
dc.identifier.year 2013 en_US
dc.identifier.conference 2nd World Construction Symposium en_US
dc.identifier.place Colombo en_US
dc.identifier.pgnos PP. 22- 32 en_US
dc.identifier.proceeding Socio economic sustainability in construction : practice , policy and research en_US
dc.identifier.email gayaniprasadika@gmail.com en_US
dc.identifier.email lalithds@uom.lk en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record