Show simple item record

dc.contributor.author Hewamulla, K
dc.contributor.author Jayasena, HS
dc.contributor.author Guruge, K
dc.contributor.editor Sandanayake, YG
dc.contributor.editor Waidyasekara, KGAS
dc.contributor.editor Gunatilake, S
dc.date.accessioned 2022-12-29T04:13:48Z
dc.date.available 2022-12-29T04:13:48Z
dc.date.issued 2022-06-24
dc.identifier.uri http://dl.lib.uom.lk/handle/123/19929
dc.description.abstract Selection of the most appropriate procurement method for a proposed project is challenging because there are many factors to be evaluated in deciding. This study focuses on the impact of procurement method on construction time waste, and it was conducted to find how the time wastage varies according to the selected procurement route. Such knowledge is important in making better decisions when selecting a procurement method. Accordingly, the research aim was set to find the significant differences of time waste between traditional and design and build procurement methods. this research was conducted from a quantitative approach, deductive theory data collected through an online survey, and for data analysis using descriptive statistics. Twenty-two (22) number of time waste factors were identified through literature review. survey respondents weighted the significance of each factor between traditional and design and build procurement methods. Ten (10) factors caused significantly higher time waste in traditional method and none of the factors caused higher time waste in design and build method. Accordingly, the study concludes that time waste in traditional procurement is generally higher in traditional procurement method compared to design and build procurement method en_US
dc.language.iso en en_US
dc.publisher Ceylon Institute of Builders - Sri Lanka en_US
dc.source.uri https://ciobwcs.com/2022-papers/ en_US
dc.subject Design and Build Method en_US
dc.subject Procurement en_US
dc.subject Time Waste en_US
dc.subject Traditional Method en_US
dc.title The impact of procurement method on construction time waste en_US
dc.type Conference-Full-text en_US
dc.identifier.faculty Architecture en_US
dc.identifier.department Department of Building Economics en_US
dc.identifier.year 2022 en_US
dc.identifier.conference World Construction Symposium - 2022 en_US
dc.identifier.place Sri Lanka en_US
dc.identifier.pgnos pp. 909-920 en_US
dc.identifier.proceeding 10th World Construction Symposium - 2022 en_US
dc.identifier.email kavishka.hewamulla@gmail.com en_US
dc.identifier.email suranga@uom.lk en_US
dc.identifier.email kaviniveenadhi1997@gmail.com en_US
dc.identifier.doi https://doi.org/10.31705/WCS.2022.73 en_US


Files in this item

This item appears in the following Collection(s)

  • WCS - 2022 [76]
    Proceedings of The 10th World Construction Symposium 2022

Show simple item record