Institutional-Repository, University of Moratuwa.  

Factors affecting construction time performance in high-rise building projects in Sri Lanka

Show simple item record

dc.contributor.author Kilintan, K
dc.contributor.author Perera, BAKS
dc.contributor.author Kajavathani, P
dc.contributor.editor Sandanayake, YG
dc.contributor.editor Waidyasekara, KGAS
dc.contributor.editor Gunatilake, S
dc.date.accessioned 2022-12-29T16:34:15Z
dc.date.available 2022-12-29T16:34:15Z
dc.date.issued 2022-06-24
dc.identifier.uri http://dl.lib.uom.lk/handle/123/19984
dc.description.abstract On-time completion is one of the most important criteria for recent successful construction projects. High-rise building projects face significant risks and time constraints due to the complexity and dynamic nature of their environments. Demand for high rise buildings has been fuelled by economic advancements, rapid suburbanization, and increased consumer spending in Sri Lanka. High-rise building developments require a large amount of funding, permissions and procedures, advanced construction methods, and collaboration between many project participants. Delays have been observed regularly in high-rise buildings, yet studies on factors affecting construction time performance (CTP) are scarce in the Sri Lankan context. Therefore, this study focused on the factors affecting CTP in high-rise building projects in Sri Lanka. If the factors were identified at early stages, they could be minimised or even mitigated and the chance of future occurrences can be minimised. The study used a qualitative approach. Factors affecting CTP were identified through the literature review. The required data were collected from a series of semi-structured interviews identified from purposive sampling. The data were analysed using manual content analysis and validated for high-rise building projects using semi-structured interviews. Fifty-four factors were identified under six categories, including owner, contractor, consultant, contract, contractual relationships and external factors. New additional factor mismatches between the design and budgets are identified. Further, interviewees endorsed 49 factors that were considered as factors that significantly affect CTP. T en_US
dc.language.iso en en_US
dc.publisher Ceylon Institute of Builders - Sri Lanka en_US
dc.source.uri https://ciobwcs.com/2022-papers/ en_US
dc.subject Construction Time Performance (CTP) en_US
dc.subject Factors affecting CTP en_US
dc.subject High-Rise Building Projects en_US
dc.title Factors affecting construction time performance in high-rise building projects in Sri Lanka en_US
dc.type Conference-Full-text en_US
dc.identifier.faculty Architecture en_US
dc.identifier.department Department of Building Economics en_US
dc.identifier.year 2022 en_US
dc.identifier.conference World Construction Symposium - 2022 en_US
dc.identifier.place Sri Lanka en_US
dc.identifier.pgnos pp. 492-505 en_US
dc.identifier.proceeding 10th World Construction Symposium - 2022 en_US
dc.identifier.doi https://doi.org/10.31705/WCS.2022.40 en_US


Files in this item

This item appears in the following Collection(s)

  • WCS - 2022 [76]
    Proceedings of The 10th World Construction Symposium 2022

Show simple item record