Institutional-Repository, University of Moratuwa.  

The Impact of client involvement on public building project performance in Sri Lankan construction industry

Show simple item record

dc.contributor.advisor Halwatura RU
dc.contributor.author Arumugam S
dc.date.accessioned 2021
dc.date.available 2021
dc.date.issued 2021
dc.identifier.citation Arumugam, S. (2021). The Impact of client involvement on public building project performance in Sri Lankan construction industry [Master's theses, University of Moratuwa]. Institutional Repository University of Moratuwa. http://dl.lib.uom.lk/handle/123/20888
dc.identifier.uri http://dl.lib.uom.lk/handle/123/20888
dc.description.abstract The clients are most important contributor and main participant for the successful construction project completion which depending on client’s behaviors and play major role that cannot be avoided. Client involvement is linked to the achievement of a project on performance. Therefore, the level of client involvement should be increased to minimize the negative impact of project performance. Therefore, this study was aimed to investigate the impact level of client involvement on the Public Building project performances during the construction process in Sri Lanka. This research has been conducted through literature reviews and questionnaire survey (quantitative method). The results from the survey were analyzed using descriptive analysis. Following this, inferential statistical analysis of testing was conducted on the data results of the survey. The Findings revealed that over all the current client had neutral or low involvement in 27 out of 40 tasks. Pearson’s correlation coefficient was used assess whether there is significant relationship between client involvement stages and performance and; all involvement of five construction stages is positively linked to performance of Time, Cost and Quality. Leaner regression analysis used to calculate the impact level of client involvement on project performance. The level of client involvement in the planning stage, design stage and construction stage were found to be the most significant and had a high level of impact on the project outcomes. The study recommended the clients need to have progressed information to review the documents, should give consideration to tasks prior to construction of the project and conduct regular site visits during construction. And assign a special O&M representative to advise the project team on how to complete the product in a manner that best achieves the project's O&M needs. en_US
dc.language.iso en en_US
dc.subject CLIENTS en_US
dc.subject CONSTRUCTION PROJECT STAGES en_US
dc.subject CONSTRUCTION INDUSTRY - Sri Lanka en_US
dc.subject PUBLIC BUILDING PROJECT - Performance en_US
dc.subject CIVIL ENGINEERING -Dissertation en_US
dc.subject CONSTRUCTION PROJECT MANAGEMENT- Dissertation en_US
dc.title The Impact of client involvement on public building project performance in Sri Lankan construction industry en_US
dc.type Thesis-Abstract en_US
dc.identifier.faculty Engineering en_US
dc.identifier.degree MSc in Construction Project Management en_US
dc.identifier.department Department of Civil Engineering en_US
dc.date.accept 2021
dc.identifier.accno TH4714 en_US


Files in this item