Use of building information modelling to mitigate cost overruns in design and build projects

Show simple item record

dc.contributor.author Chamikara, KL
dc.contributor.author Perera, BAKS
dc.contributor.author Kurukulasooriya, IN
dc.date.accessioned 2023-08-23T05:00:43Z
dc.date.available 2023-08-23T05:00:43Z
dc.date.issued 2023-07-21
dc.identifier.uri http://dl.lib.uom.lk/handle/123/21345
dc.description.abstract Cost overrun in the design and build (D&B) procurement method is a significant obstacle in achieving the project goals. Therefore, it has become critical consideration over its numerous benefits when selecting this procurement method. However, applying new technologies, such as Building Information Modelling (BIM), can significantly minimise this issue. Thus, this study aims to investigate the use of BIM to manage the cost overrun issues in D&B projects. A qualitative approach based on two rounds of interviews was conducted to collect the data. The study findings revealed ten highly important causes of cost overrun in D&B projects. Continuous design and drawings changes due to incomplete initial drawings prepared with insufficient design data at tendering stage, errors or omissions revealed during construction, and inefficient planning and scheduling by the contractor were the top three causes. Further, BIM functions such as interoperability and exchange of information, clash detection, digitalised quantity take off, and cloud computing were identified as they can be used to manage highly important causes of cost overrun in D&B projects. This research assists professionals in identifying the most appropriate BIM functions to reduce the fear of price uncertainty when implementing the D&B procurement method in their projects. Further research on identifying the barriers and suitable strategies for implementing BIM in D&B projects to reduce cost overrun can be based on the present study. en_US
dc.language.iso en en_US
dc.publisher Ceylon Institute of Builders - Sri Lanka en_US
dc.subject Building Information Modelling (BIM) en_US
dc.subject Causes en_US
dc.subject Cost overrun en_US
dc.subject Design and Build projects en_US
dc.subject BIM Functions en_US
dc.title Use of building information modelling to mitigate cost overruns in design and build projects en_US
dc.type Conference-Full-text en_US
dc.identifier.faculty Architecture en_US
dc.identifier.department Department of Building Economics en_US
dc.identifier.year 2023 en_US
dc.identifier.conference World Construction Symposium - 2023 en_US
dc.identifier.place Sri Lanka en_US
dc.identifier.pgnos pp. 1104-1115 en_US
dc.identifier.proceeding 11th World Construction Symposium - 2023 en_US
dc.identifier.email lasiduchamikara98@gmail.com en_US
dc.identifier.email pererabaks@gmail.com en_US
dc.identifier.email kisuriniwanthika@gmail.com en_US
dc.identifier.doi https://doi.org/10.31705/WCS.2023.88 en_US


Files in this item

This item appears in the following Collection(s)

  • WCS - 2023 [91]
    Proceedings of The 11th World Construction Symposium 2023

Show simple item record