Importance of detailed consideration of construction sequence in installation of retaining walls with excavation : a case study

Show simple item record

dc.contributor.advisor Kulathilaka SAS
dc.contributor.author Chathurangani PGDW
dc.date.accessioned 2022
dc.date.available 2022
dc.date.issued 2022
dc.identifier.citation Chathurangani, P.G.D.W. (2022). Importance of detailed consideration of construction sequence in installation of retaining walls with excavation : a case study [Master's theses, University of Moratuwa]. Institutional Repository University of Moratuwa. http://dl.lib.uom.lk/handle/123/21432
dc.identifier.uri http://dl.lib.uom.lk/handle/123/21432
dc.description.abstract Earth retaining structures are a key component in most engineering constructions. The present design practice as per the standard procedure is limited to analysis the structure under anticipated permanent design loads. However, in reality, the structure undergoes numerous loading patterns depending on the construction methodology as well as construction sequence that might be vary in type, magnitude, direction and distribution to that of design loads. The recent construction experience of some projects in Colombo indicates that these unaccounted loading patterns in construction stages could lead to failure modes that were not expected during design phase. In this study, a detailed forensic analysis is carried out for one case study by means of numerical modeling of different loadings undergone during various stages of the construction stage and root cause of failure for each case is identified. A gap analysis is carried out to ascertain that why the root causes had not been taken in to consideration during the design phase and recommendations are proposed to the design procedure currently practiced to avoid future such consequences. en_US
dc.language.iso en en_US
dc.subject URBAN ENVIRONMENTS – Sri Lanka en_US
dc.subject RETAINING WALLS en_US
dc.subject SUBSEQUENT PROCESS OF REMEDIATION en_US
dc.subject CONSTRUCTION SEQUENCE en_US
dc.subject FOUNDATION ENGINEERING & EARTH RETAINING SYSTEM - Dissertation en_US
dc.subject CIVIL ENGINEERING - Dissertation en_US
dc.title Importance of detailed consideration of construction sequence in installation of retaining walls with excavation : a case study en_US
dc.type Thesis-Abstract en_US
dc.identifier.faculty Engineering en_US
dc.identifier.degree M.Eng in Foundation Engineering and Earth Retaining Systems en_US
dc.identifier.department Department of Civil Engineering en_US
dc.date.accept 2022
dc.identifier.accno TH4920 en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record