Institutional-Repository, University of Moratuwa.  

Voltage control in a Transmission system area with high renewable energy penetration case study : Chunnakam Grid Substation

Show simple item record

dc.contributor.advisor Arachchige LNW
dc.contributor.author Wijepala MHP
dc.date.accessioned 2023T08:52:44Z
dc.date.available 2023T08:52:44Z
dc.date.issued 2023
dc.identifier.citation Wijepala, M.H.P. (2023). Voltage control in a Transmission system area with high renewable energy penetration case study : Chunnakam Grid Substation [Master's theses, University of Moratuwa]. Institutional Repository University of Moratuwa. http://dl.lib.uom.lk/handle/123/22669
dc.identifier.uri http://dl.lib.uom.lk/handle/123/22669
dc.description.abstract The northern part of Sri Lanka has higher wind and solar penetration. Chunnakam and Kilinochchi grid substations are operating in that area, and they are connected to the national grid via a 132 kV double-circuit transmission line from New Anuradhapura to Chunnakam. The Ceylon Electricity Board (CEB) owned thermal power plant (Chunnakam thermal power plant – 8 MW×3) and several private wind plants are operating in the northern area, and those generation plants are connected to 33 kV distribution feeders of either Chunnakam or Kilinochchi grid substation. Synchronous generators have been the main source of dynamic reactive power control in conventional power systems. However, the replacement of conventional power plants by inverter-based generation resources, such as wind power plants, has resulted in diminished dynamic reactive power reserve at the system level. According to the CEB standards, acceptable high voltage variation under normal operating condition is, 5% from the rated voltage. During the peak period high voltage levels of the Chunnakam grid substation go below the acceptable limits due to the high demand and low wind power generation. To supply power at the required voltage, thermal power plants connected to the Chunnakam grid substation are operated during peak time. However, when demand increases, these thermal power plants are not sufficient to control the voltage levels. On the other hand, during off-peak times, high voltage levels of the Chunnakam and Kilinochchi grid substations go over the acceptable limits due to the Ferranti effect. The current solution being practiced by the utility is to isolate one of the double-circuit transmission lines from New Anuradhapura to Chunnakam, and control the voltage levels by increasing transmission line losses. This is an inefficient voltage control mechanism. In this research, a case study is carried out to develop a voltage control method for Chunnakam, Kilinochchi, and Vavuniya grid substations, and a voltage control scenario is developed based on the ten years forecasted demand and renewable distributed generation in those areas. Reactive power compensation by shunt capacitor and battery energy storage systems were the two main voltage control techniques that are considered for the study and the best solution for selected area transmission network was selected through a tech-economic evaluation en_US
dc.language.iso en en_US
dc.subject RENEWABLE ENERGY
dc.subject VOLTAGE CONTROL OPTIMIZATION
dc.subject HIGH WIND PENETRATION
dc.subject VOLTAGE CONTROL
dc.subject ELECTRICAL ENGINEERING – Dissertation
dc.subject MSc in Electrical Engineering
dc.title Voltage control in a Transmission system area with high renewable energy penetration case study : Chunnakam Grid Substation en_US
dc.type Thesis-Abstract en_US
dc.identifier.faculty Engineering en_US
dc.identifier.degree MSc In Electrical Engineering by research en_US
dc.identifier.department Department of Electrical Engineering en_US
dc.date.accept 2023
dc.identifier.accno TH5125 en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record