dc.description.abstract This study is mainly based on the performance of the operators who work in the double cylinder .knitting department. by the help of method study and work measurement the following improvements have been achieved Achievements 1) payment scheme to upgrade operator performance 2 ) installation of new methods. 3) cost reduction This study was Carried out under two limitations 1 without changing machines to new machine 2 under prevailing circumstances This project report would also serve for further study of the situations where group of operatives are working under restricted work. en_US
dc.description.abstract
dc.format.extent 136p.: ill. en_US
dc.language.iso en en_US
dc.subject TEXTILE TECHNOLOGY-Project Report en_US
dc.subject TEXTILE INDUSTRY-Work-Study en_US
dc.title Suggestions to upgrade operator performance while reducing cost by introducing new payment scheme en_US
dc.type Thesis-Abstract
dc.identifier.faculty Engineering en_US
dc.identifier.degree PG in Textile en_US
dc.identifier.department Department of Textile Technology en_US
dc.date.accept 1986
dc.date.accept 1986
dc.identifier.accno 75860 en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record