dc.description.abstract |
This study is mainly based on the performance of the operators who work in the double cylinder .knitting
department. by the help of method study and work measurement the following improvements have been
achieved
Achievements
1) payment scheme to upgrade operator
performance
2 ) installation of new methods.
3) cost reduction
This study was Carried out under two limitations
1 without changing machines to new machine
2 under prevailing circumstances
This project report would also serve for further study of the situations where group of operatives are
working under restricted work. |
en_US |
dc.description.abstract |
|
|
dc.format.extent |
136p.: ill. |
en_US |
dc.language.iso |
en |
en_US |
dc.subject |
TEXTILE TECHNOLOGY-Project Report |
en_US |
dc.subject |
TEXTILE INDUSTRY-Work-Study |
en_US |
dc.title |
Suggestions to upgrade operator performance while reducing cost by introducing new payment scheme |
en_US |
dc.type |
Thesis-Abstract |
|
dc.identifier.faculty |
Engineering |
en_US |
dc.identifier.degree |
PG in Textile |
en_US |
dc.identifier.department |
Department of Textile Technology |
en_US |
dc.date.accept |
1986 |
|
dc.date.accept |
1986 |
|
dc.identifier.accno |
75860 |
en_US |