dc.description.abstract Proportion of Non-Revenue Water (NRW) measured as a percentage of the total water distributed to consumers varies from 10% to 55% in most of the existing piped water supply schemes. Loss of revenue due to NRW is enormous. Analyses of losses to the utility in the above aspect and comparative studies on the cost of improving existing systems verses cost of construction of new systems may be useful for planners as well as for network system designers. It will also be helpful in reducing the substantial investment to build new water supply project to cater to the increasing demand. However, the time has come for planning, design and construction of systems with minimum operation and maintenance burden using the world's best available practices and also to have programmers for controlling water losses in existing systems. This enable to save the limited water resource, to have the maximum benefit from the money spent mostly out of foreign loans and to expand the pipe borne water supply facility to more than 50% of the population who are deprived of the facility. To analyze the financial viability of Construct ion of new water supply system Vs rehabilitation/augmentation of existing system, this research was conducted. This study is focused to select the most cost effective option in meeting increasing demand for drinking water by cost saving of reduction of NRW compared to investment in development of new scheme in Kandy Area. To attain this purpose, Harispaththuwa ,Akurana,and Ampitiya Schemes were considered to calculate the Cost of Rehablitation . Construction cost of Ulapane scheme was taken as the construction of new water supply scheme. Internal rate of return was calculated for both projects and compared each other. According to, the comparison Rehabilitation/augmentation of existing system was financially viable but NRW saving from rehabilitation is not sufficient to cater to the projected current and future demand
dc.language.iso en en_US
dc.subject A Dissertation submitted to the Department of Civil Engineering for the MBA
dc.title Cost effectiveness of non revenue water reduction in greater Kandy area
dc.type Thesis-Abstract
dc.identifier.faculty Engineering en_US
dc.identifier.degree MBA en_US
dc.identifier.department Department of Civil Engineering en_US
dc.date.accept 2009
dc.identifier.accno 94510 en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record