Engineering management of time extension claims for the National Water Supply and Drainage Board.

Show simple item record

dc.contributor.advisor Kodikara, GW
dc.contributor.author Premanath, KLL
dc.date.accessioned 2011-06-08T08:47:11Z
dc.date.available 2011-06-08T08:47:11Z
dc.identifier.uri http://dl.lib.mrt.ac.lk/handle/123/936
dc.description.abstract In the sphere of construction contracts where the two parties Client and Contractor are involved it is characteristic to anticipate the susceptibility of the construction projects to many variation claims which generally cover a vast scope. These claims include Increase of Cost and/or Time Extensions. This research which has been limited to the subject of Time Extension Claims has been done with the objective of enlightening the NWS&DB Engineers with the problems associated in Time Extension Claims. In order to achieve this target a familiarization was found necessary of the Conditions of Contract (ICTAD 1989), Government Financial Regulations (Ministry of Finance 1992) and delegation of Financial Authority (NWS&DB 1991), which have been studied in relevance. It was found practically helpful and interesting to analyse a number of case studies from various construction contracts that were relevant to Time Extension Issues in order to give better expression to the subject under scrutiny, thus enabling achievements of the required objectives.
dc.language.iso en en_US
dc.subject DISSERTATIONS, ACADEMIC
dc.subject CONSTRUCTION INDUSTRY-CONTRACTS-SRI LANKA
dc.subject WATER SUPPLY-CONTRACTS-SRI LANKA
dc.title Engineering management of time extension claims for the National Water Supply and Drainage Board.
dc.type Thesis-Abstract
dc.identifier.faculty Engineering en_US
dc.identifier.degree MEng en_US
dc.identifier.department Department of Civil Engineering en_US
dc.date.accept 1994
dc.identifier.accno 63060 en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record